Nestle Middle East Sand Stabilization
Nestlé Middle East contacted Soil Solutions Middle East to provide a solution for sand stabilization and dust prevention outside their factory.
The SSME team conducted a site inspection and determined that with a little preparatory work the area could be treated with EBS Soil Stabilizer, which would provide the solution required by Nestlé. The area was prepared by removing the excess accumulated sand and sweeping the surface, once prepared the surface was treated with the EBS Soil Stabilizer utilizing a pump and spray system then allowed to cure before opening back up to pedestrian traffic.
The treatment with the EBS Soil Stabilizer will eliminate the drifting sand, prevent dust and provide a healthier and safer working environment.
Initial application was completed in May of 2016. See pictures from October 2018 2.5 years later with no maintenance having been done and the EBS Sand Stabilization still performing with the prevention of drifting sand and blowing dust.